The stack
Layer 3 · Manage

OptiCheck

The operation, recorded as it runs, against the plan.

OptiCheck follows who does what and when, and holds it next to what was planned. Nobody buys a task manager. They buy the end of the argument about whether the work was done.

What it holds
PLAN VS. ACTUAL
People skills · certifications
Locations sites · gates · areas · rooms
Items and inventory on hand · where · condition
Exceptions with a photo
Tasks assigned 09:02 · closed 09:14 · washroom L1
the same blocks in every domain
a task ties the others together
The problem

A plan with no record behind it

Most operations know what was planned and find out what happened at the end of the shift, from whoever reports it.

  • Done means someone said so

    Tasks are ticked off without evidence, so completion cannot be checked after the fact.

  • Breaches found after the shift

    By the time a missed task shows up in a report, the window to fix it has closed.

  • Inspection everywhere, equally

    Inspectors walk the same rounds whether an area is fine or failing.

  • Plans built on guesses

    Without real task times, every plan repeats the estimates of the last one.

What it holds

One model of the operation

The same blocks describe a terminal, a depot or an office building. A task ties the others together.

Tasks

Assigned and closed, with proof by scan or badge at the location, by the right person, at the right time.

People

Skills and certifications: who is allowed to do what.

Locations

Identified places where work happens: gates, stands, areas, rooms.

Items and inventory

What the operation handles, what is on hand, where, and in what condition.

Exceptions

Anything that went off plan, recorded on the spot with a photo.

Plan against actual

What was planned and what was delivered, side by side, in one query.

What changes

A plan becomes a record, and the record becomes the next plan

Proof a contract manager accepts

Completion backed by the badge, the location and the time, not by a signature on a sheet.

Breaches caught during the shift

A missed task shows up while there is still time to send someone.

Inspection by exception

Inspectors go where the record says something is wrong, instead of walking every round.

True durations for the optimizer

Real task times are what erdosP-3 plans against, which keeps the plan grounded in how the work is actually done.

End the argument about whether the work was done

Tell us how you check completion today. If half of it is not measured, that is already the first finding.