We optimize.

Decision intelligence for critical operations

Four products. One platform. End to end.

Live at Ground handling operations, in daily use at BUD Read the BUD case study

Trusted by

NodnAI
Dörmata Facility
BUD
MÁV Csoport
Ivanics Csoport
Liwo
InterWatt
WM Systems
NodnAI
Dörmata Facility
BUD
MÁV Csoport
Ivanics Csoport
Liwo
InterWatt
WM Systems
NodnAI
Dörmata Facility
BUD
MÁV Csoport
Ivanics Csoport
Liwo
InterWatt
WM Systems
NodnAI
Dörmata Facility
BUD
MÁV Csoport
Ivanics Csoport
Liwo
InterWatt
WM Systems

Four layers, one platform


Walked from the bottom up, which is also the order they are bought in. Each layer is useful without the one above it.

TRACK · OPTITRACK

Capture what actually happened

Trackers, card readers, scanners, sensors and managed devices record who did what, where and when, on the floor where it happened.

FIELD INPUTS → ONE RECORD
Scanners
Sensors
Trackers
Card readers
1RECORD
no cameras in a washroom
UNDERSTAND · OPTISIGHT

One operational picture

Every source you already run, joined into one semantic database per tenant. Nothing you own gets ripped out.

SOURCES → ONE DATABASE
AODB
Rostering and HR
GSE telematics
OptiTrack
ONE DATABASE
Charts
Reports
?
Questions in plain language
nothing you own gets ripped out
MANAGE · OPTICHECK

The operation against the plan

Who does what and when, recorded while the shift runs. Breaches are caught during the shift instead of after it.

PLAN VS. ACTUAL, LIVE
Turnaround 3A · baggage
ON TIME
Washroom L1 · cleaning
DONE
Turnaround 4B · loading
6 MIN BEHIND
Turnaround 5C · pushback
AT RISK
SLA risk on 4B Sent to duty manager, 14:06
OPTIMIZE · ERDOSP-3

Re-solve the day that is actually happening

Our own solver holds your rest rules, licences, collective agreements and equipment limits. The language model writes the constraints, the solver does the math.

SHIFT PLAN · 06:00 → 14:00 RE-SOLVED
Crew A
Crew B
Loaders
Pushback
De-icing
rest rules held
all constraints met
The stack

Track, Understand, Manage, Optimize

Four layers, one platform. Each layer is useful without the one above it, so you can start at the bottom.

Optimize erdosP-3 Manage OptiCheck Understand OptiSight Track OptiTrack
How we start

A phased start, measured from day one

We begin with a measured baseline of your operation, then roll out layer by layer. Scope and terms are agreed with you, one step at a time.

  1. 01

    Consultation

    We measure how your operation runs today and where the gap is, and agree a plan for closing it.

    baseline + plan
  2. 02

    Integration

    We connect to your systems and put the stack live on your operation.

    stack live
  3. 03

    Usage

    The platform runs on your operation, with regular reviews while it settles in.

    regular reviews

Start with a thirty-minute call

We ask for a few numbers about your operation. No demo and no system access. If half of them are not measured yet, that is already the first finding.